The process of roof replacement in Asheville generally follows a standard industry procedure but is tailored to the local climate and building codes. Here’s a step-by-step breakdown of what you can expect:
📝 1. Initial Inspection & Estimate
-
A contractor visits your home to assess the roof’s condition.
-
They check for signs of wear, water damage, mold, structural issues, etc.
-
You’ll receive a written estimate outlining labor, materials, timelines, and costs.
📑 2. Contract & Permits
-
Once you choose a contractor, you’ll sign a contract.
-
The contractor pulls necessary permits from the City of Asheville or Buncombe County, depending on your location.
-
They’ll also coordinate any Homeowners Association (HOA) requirements if needed.
🏗️ 3. Preparation
-
Schedule a start date (weather permitting).
-
The contractor orders materials (shingles, underlayment, flashing, etc.).
-
Protective measures are taken (e.g., tarps over landscaping, moving patio furniture).
🔧 4. Old Roof Removal
-
The existing shingles or other roofing materials are stripped down to the deck.
-
Damaged decking is replaced if needed.
💧 5. Deck Inspection & Repairs
-
They check the wood decking for rot, mold, or structural issues.
-
Repairs are made before installing new materials.
🛠️ 6. New Roof Installation
-
Installation of:
-
Ice & water shield (especially in valleys and eaves—important in Asheville’s snowy zones)
-
Underlayment (synthetic or felt)
-
New flashing, drip edges, and vents
-
Roofing material (shingles, metal, tile, etc.)
-
-
Ventilation systems (like ridge vents or attic fans) are updated or added if needed.
🧹 7. Clean-Up & Final Inspection
-
All debris is removed, including nails (often using magnets).
-
The contractor performs a final walkthrough with you.
-
Some contractors offer drone or photo inspections for documentation.
🛡️ 8. Warranty & Paperwork
-
You receive:
-
Workmanship warranty (usually 5–10 years)
-
Manufacturer warranty on roofing materials (20+ years depending on type)
-
Final invoice and proof for insurance/HOA if needed
-
📆 Timeline & Costs
-
Typical Duration: 1–3 days for most homes
-
Average Cost in Asheville:
-
Contact us for quotations.
-
More for metal, tile, or steep/complex roofs
-
Would you like help estimating cost based on your roof’s size or selecting materials that work well in Asheville’s climate (humid summers, occasional snow, tree debris)?